Bank Exams Practice Question and Answer

Q: K is 4 times as fast as L and working together, they can complete a work in 24 days. In how many days can L alone complete the work ? 1541 0

  • 1
    30 days
    Correct
    Wrong
  • 2
    40 days
    Correct
    Wrong
  • 3
    120 days
    Correct
    Wrong
  • 4
    80 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "30 days"
Explanation :

Answer: A) 30 days Explanation: Given K=4L  -->K+L = 4L+L = 5L   These 5L people can complete the work in 24 days, which means L alone can do the work in (24 x 5)=120 days.   Hence, K alone can do the work in 120/4= 30 days.

Q: P and Q can do a work in 4 hours and 12 hours respectively. P starts the work at 9am and they work alternately for one hour each. When will the work be completed ? 1761 0

  • 1
    3 am
    Correct
    Wrong
  • 2
    12 pm
    Correct
    Wrong
  • 3
    1 pm
    Correct
    Wrong
  • 4
    3 pm
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "3 pm"
Explanation :

Answer: D) 3 pm Explanation: Work done by P and Q in the first two hours, working alternately = First hour P + Second hour Q ⇒14+112=13 work is completed in 2 hours Then, the total time required to complete the work by P and Q working alternately=2 x 3= 6hours Thus, work will be completed at 3pm.

Q: Raghu can complete a work in 12days working 9 hours a day. Arun can complete the same work in 8 days working 11 hours a day. If both Raghu and Arun work together, working 12 hours a day, in how many days can they complete the work ? 1415 0

  • 1
    3449 days
    Correct
    Wrong
  • 2
    12449 days
    Correct
    Wrong
  • 3
    4349 days
    Correct
    Wrong
  • 4
    41249 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "4349 days"
Explanation :

Answer: C) Option C Explanation: Raghu can complete the work in (12 x 9)hrs = 108 hrs.    Arun can complete the work in (8 x 11)hrs = 88 hrs.   Raghu's 1 hrs work = 1/108 and Arun's 1 hrs work = 1/88   (Raghu + Arun)'s 1 hrs work = 1108+188=492376  So, both Raghu and Arun will finish the work in 237649 hrs Number of days of 12 hours each=237649×112 = 19849=4349 days

Q: K can finish the work in 18 days and L can do the same work in 15 days. L worked for 10 days and left the job. In how many days, K alone can finish the remaining work ? 1285 0

  • 1
    5.5 days
    Correct
    Wrong
  • 2
    6 days
    Correct
    Wrong
  • 3
    4.2 days
    Correct
    Wrong
  • 4
    5 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "6 days"
Explanation :

Answer: B) 6 days Explanation: L's 10 days work = 115×10=23   Remaining work = 1-23=13   Now,  work is done by K in one day = 1/18   1/3 work is done by K in  18×13 = 6 days

Q: Twenty men can do a work in eighteen days. Eighteen women can complete the same work in fifteen days. What is the ratio between the capacity of a woman and a man ? 1645 0

  • 1
    4:5
    Correct
    Wrong
  • 2
    3:4
    Correct
    Wrong
  • 3
    4:3
    Correct
    Wrong
  • 4
    2:3
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "4:3"
Explanation :

Answer: C) 4:3 Explanation: (20 x 18) men can complete the work in in one day. one man's one day work = 1/360 (18 x 15) women can complete the work in 1 day 1 woman's one day work = 1/270 So, required ratio = 1270:1360= 4:3

Q: In a hostel, there was food for 1000 students for one month. After 10 days, 1000 more students joined the hostel. How long would the students be able to carry on with the remaining food? 2030 0

  • 1
    10 days
    Correct
    Wrong
  • 2
    15 days
    Correct
    Wrong
  • 3
    20 days
    Correct
    Wrong
  • 4
    5 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "10 days"
Explanation :

Answer: A) 10 days Explanation: After 10 days, the remaining food would be sufficient for the 1000 students for 20 more days -->If 1000 more students are added, it shall be sufficient for only 10 days (as the no. of students is doubled, the days are halved).

Q: A tank-full petrol in Veeru’s Car last for 20 days. If he starts using 25% more every day, how many days will the tank-full petrol last? 2134 0

  • 1
    18 days
    Correct
    Wrong
  • 2
    12 days
    Correct
    Wrong
  • 3
    14 days
    Correct
    Wrong
  • 4
    16 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "16 days"
Explanation :

Answer: D) 16 days Explanation: The analogy here is like this: Veeru has 20 lt of petrol and he uses 1 lt per each day and consumes it in 20 days. If he uses 1.25 lt every day, in how many days it will be consumed?We considered 1.25 lt here because it’s 25% more than 1 lt. The answer would be  20/1.25=16 days.

Q: A box contains 5 green, 4 yellow and 5 white pearls. Four pearls are drawn at random. What is the probability that they are not of the same colour ? 1615 0

  • 1
    11/91
    Correct
    Wrong
  • 2
    4/11
    Correct
    Wrong
  • 3
    1/11
    Correct
    Wrong
  • 4
    90/91
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "90/91"
Explanation :

Answer: D) Option D Explanation: Let S be the sample space. Then,n(s) = number of ways of drawing 4 pearls out of 14 = C414 ways = 14×13×12×114×3×2×1= 1001 Let E be the event of drawing 4 pearls of the same colour.Then, E = event of drawing (4 pearls out of 5) or (4 pearls out of 4) or (4 pearls out of 5)   ⇒C15+ C44+ C15 = 5+1+5 =11  P(E) = n(E)n(S)=111001=191      Required probability = 1-191=9091

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully