Q:

The review should also address the __________ in the planning system that are causing unnecessary delays and costs to the construction sector, the CIF said.

  • 1
    incentives
  • 2
    stockpile
  • 3
    deadlock
  • 4
    bottlenecks
  • Show Answer
  • Workspace

Answer : 4. "bottlenecks"