A can do a piece of work in 15 days and B can do it in 16 days and C can do it 24 days. They started the work together and A leaves after 3 days and B leaves after 4 days from the beginning. How long will work lost ?5
1093 5b5cc6dae4d2b4197774e8dc
Q: A can do a piece of work in 15 days and B can do it in 16 days and C can do it 24 days. They started the work together and A leaves after 3 days and B leaves after 4 days from the beginning. How long will work lost ?
- 110 2/3 daysfalse
- 213 1/5 daystrue
- 312 2/3 daysfalse
- 411 5/7 daysfalse
- Show Answer
- Workspace
- Discuss